PERENCANAAN SEKUEN (SHORT TERM) PENAMBANGAN UNTUK MENCAPAI TARGET PRODUKSI BULAN MARET 2019 DI PIT 2 ELEKTRIFIKASI BANKO BARAT PT BUKIT ASAM TBK. TANJUNG ENIM SUMATERA SELATAN
Dalam proses penambangan terbagi menjadi beberapa planning, yang diantaranya rencana daily dan weekly (short term), rencana monthly dan quarter (mid term) serta rencana annual hingga life of mine (long term) [Barber dan Hanna 2000]. perencanaan sekuen penambangan berguna untuk menentukan lokasi-lokasi mana saja yang akan ditambang perbulannya dalam jangka waktu satu tahun ke depan dengan target produksi yang telah ditentukan tiap bulannya untuk mencapai target produksi dalam satu tahun. Dalam perencanaan sekuen penambangan yang dibagi menjadi perminggu haruslah memerhatikan luas dan kedalaman seam batubara guna mengetahui perubahan/kemajuan elevasi tiap minggunya serta arah aliran air. Tak lupa rencana jumlah alat untuk penambangan disiapkan. Dalam penelitian ini, untuk mengupas 767.000 bcm overburden direncanakan adanya 3 fleet terdiri 1 shovel PC3000 dan 6 belaz dengan produktifitas 1.388 bcm/hari, dan untuk menambang 250.000 ton batubara direncanakan adanya 5 fleet terdiri 1 excavator PC400 dan 6 dump truck dengan produktifitas 262.6 ton/hari.rnrnIn the mining process is divided into several plans, which include daily and weekly (short term) plans, monthly and quarterly plans (mid term) as well as annual to life of mine (long term) plans [Barber and Hanna 2000]. Mining sequencing planning is part of the long term planning, which is a plan to determine which locations will be mined per month in the next one year with a predetermined production target each month to reach the production target in one year. In planning mining sequences which are divided into weeks must pay attention to the width and depth of coal seams in order to determine changes / advances in elevation each week. Not to forget to planning the number of haevy equipment for mining. In this study, it was planned to cut 767.000 bcm of overburden and it need 3 fleets consisting of 1 shovel PC3000 and 6 belaz type of 75135 with productivity of 1.388 bcm/day, and to mine 250.000 tons of coal it was planned to have 5 fleets consisting of 1 excavator PC400 and 6 dump trucks with productivity of 262,6 tons / day.,
Tidak tersedia versi lain