Gaya APA
IMPROVEMENT OF PRODUCTION SHOP FLOOR SCHEDULING IN SEWING LINE AT TOY MANUFACTURING SUBCONTRACT. (2020).
BEKASI:
President university.
Gaya MLA
IMPROVEMENT OF PRODUCTION SHOP FLOOR SCHEDULING IN SEWING LINE AT TOY MANUFACTURING SUBCONTRACT.
.
BEKASI:
President university,
2020.
Text.